Flint Road Rehabilitation Project - 18-40-1940

The Work includes repairing the existing asphalt pavement surface including asphalt patching, crack sealing, curb line grinding, roadway excavation, asphalt paving, paving reinforcement fabric, and asphalt overlay paving, painted lane striping and pavement markings. Two-way traffic movement through the site shall be maintained at all times as shown on plans. The work shall be constructed in two phases as identified on the plans.

Status

Bidding Closed

Prebid Date8/1/19 10:00 am

Bid Date8/13/19 1:00 pm

Company & Contacts

Spokane International Airport

Lisa Corcoran - lcorcoran@spokaneairports.net   (509) 455-6406

Location

Spokane, WA

Project Estimate: $600,000 – $700,000

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

08/01 – A MANDATORY Pre-Bid Conference will be held in the Executive Conference Center at the Spokane International Airport at 10:00 a.m. Thursday, August 1, 2019. Major subcontractors are encouraged to attend; however, it is mandatory for Prime Contractors only.