Public Jobs

Bidding Closed
9/7/21 10:00am
Storage Unit Demolition - 21-20-1714
Bidding Closed
Spokane International Airport
Spokane, WA
Work generally consists of demolition of the existing storage units and other structures onsite, asbestos mitigation and removal, foundation removal, site clearing, excavation, pavement removal, utility modifications, fence removal, site restoration and other miscellaneous items.
Bidding Closed
8/19/21 10:00am
Landside Snow Removal Services RFP
Bidding Closed
Spokane International Airport
Spokane, WA
The Spokane Airport Board is requesting proposals from qualified professional firms or individuals to perform Landside Snow Removal Services for Spokane International Airport.
Bidding Closed
7/7/21 10:00am
Electric Vehicle Charging Stations - 20-40-1983
Bidding Closed
Spokane International Airport
Spokane, WA
The Work includes the installation of new electric vehicle charging stations for the West Parking Garage, outside parking area on the north side of the East Parking Garage and new lighting upgrade improvements in the outside parking area north of the East Parking Garage. The Work also includes pavement cutting and replacement, sidewalk removal, landscaping replacement and irrigation repair, gravel surfacing, parking wheel stops, signs, conduit and conductor installation , electrical equipment and enclosures, parking area lighting upgrades, and connection to a new electrical service for the West Parking Garage.
Bidding Closed
6/24/21 2:00pm
Unit Price Roofing Repair - 21-44-1712
Bidding Closed
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: Public works roofing services on a task order, time and materials basis. Work may cover, but not be limited to, all phases of temporary or permanent installation, repair, remodel, rebuild, replace, minor construction, alteration, improvement, maintenance, and other related miscellaneous items.
Bidding Closed
6/17/21 2:00pm
Terminal Restroom Partition Replacement - 20-44-1703
Bidding Closed
Spokane International Airport
Spokane
The general nature of the Work is as follows: Replacement of restroom partitions in six washrooms located on the landside of the Main Terminal Building. Work also includes replacement of select accessories and miscellaneous repairs to the washrooms.
Bidding Closed
7/14/21 4:00pm
Rail-Truck Transload Facility - 19-43-1966
Bidding Closed
Spokane International Airport
Spokane, WA
The Work includes construction of a new railroad yard and runaround track to serve a freight loading and circulation station, a vehicle access driveway to provide vehicle freight access to the paved transload circulation area, fencing, a small operation building and utility and drainage improvements, including site lighting, drainage treatment and disposal and water and sanitary sewer infrastructure improvements.
Bidding Closed
5/24/21 10:00am
New West Infield Taxilane at Felts Field - 21-30-1706
Bidding Closed
Spokane International Airport
Spokane, WA
Work generally consists of marking removal, and demolition of the existing West Infield Apron, construction of the West Infield Taxilanes, airfield lighting modifications, excavation, subbase course, base course, bituminous pavement, applying pavement markings on the airfield, drainage improvements, water utility modifications, sanitary sewer utility modifications, electrical utility modifications, installation of a prefabricated structure, topsoiling, seeding and other miscellaneous items.
Bidding Closed
5/3/21 2:00pm
Unit Price Landside Pavement Rehabilitation - 21-40-1711
Bidding Closed
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: On-call pavement repairs on the landside (outside) of the airfield security fence.
Bidding Closed
5/3/21 2:00pm
Unit Price Airside Pavement Rehabilitation - 21-41-1710
Bidding Closed
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: On-call pavement repairs on the landside (outside) of the airfield security fence.
Bidding Closed
4/20/21 2:00pm
Business Park Roadway Improvements - 20-40-1994
Bidding Closed
Spokane International Airport
Spokane
Includes widening and repaving S. Godfrey Blvd from W. Pilot Dr. to approximately 1,200 ft. to the north at which point it will intersect with a new road, W. Airlift Ave. which will be constructed starting from S. Godfrey Blvd. and ending at the intersection with S. Davison Blvd. The Work also includes adjusting existing utilities and installing new utilities as required within the limits of the project improvements. Utilities within the corridor include storm drainage, sanitary sewer, water, power, ITS, and telecomm franchise utilities.