Public Jobs

Bidding Closed
6/25/20 2:00 pm
Unit Price Roofing Repair - 20-49-1990
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: Public works roofing services on a task order, time and materials basis. Work may cover, but not be limited to, all phases of temporary or permanent installation, repair, remodel, rebuild, replace, minor construction, alteration, improvement, maintenance, and other related miscellaneous items.
Bidding Closed
4/1/20 10:00 am
Outside Parking Lot Reconfiguration - 20-40-1984
Spokane International Airport
Spokane, WA
The Work includes, but is not limited to: saw-cutting, sub-base excavation, pavement patching, pavement marking removal and replacement, seal coating, ADA ramps, signage, light pole replacement, and miscellaneous electrical work. Removing/grinding of failed pavement areas will extend full-depth (1-1/2 to 2 inches) to remove the defective material. The sub-base will be excavated and replaced with suitable material. The depth of subgrade will extend 9-inches below the asphalt surface. The subgrade will be backfilled and compacted, and 3-inch pavement patch will be placed. The entire lot will be seal coated prior to placing pavement markings. The project will be completed in two phases.
Bidding Closed
3/26/20 1:00 pm
Landside Pavement Rehabilitation - 20-40-1989
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: On-call pavement repairs on the landside (outside) of the airfield security fence.
Bidding Closed
3/26/20 12:30 pm
Airside Pavement Rehabilitation - 20-41-1988
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: On-call pavement repairs on the airside (inside) of the airfield security fence.
Bidding Closed
3/31/20 2:00 pm
TSA Office Refresh - 20-44-1979
Spokane International Airport
Spokane, WA
Interior upgrades to approximately 2,675 s.f. of Offices and various rooms consisting primarily of floor covering, ceiling, lighting and select countertop replacement, painting and window covering. Cabinets replacement is an alternate.
Bidding Closed
2/28/20 10:00 am
Airport Drive Inbound Realignment (Re-Bid) - 18-41-1937
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: •Construct 3,000 feet of 2-lane principal arterial roadway on Airport property. •The Work includes clearing and grubbing, excavation and backfill, grading, storm drainage improvements, utilities by the Contractor and purveyors, base course, paving, striping, signing, fencing, site lighting, landscaping, and various other site improvements.
Bidding Closed
2/26/20 2:00 pm
Concourse 'C' Boiler Modifications - 19-44-1962
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: Disassembly, cleaning, re-assembly of approximately 22 sections / 120 feet of boiler flue
Bidding Closed
2/24/20 2:00 pm
Felts Field Playground & Mamer Clock Tower - 19-30-1968
Spokane International Airport
Spokane, WA
The Work includes the installation of playground equipment, poured-in-place resilient playground surfacing, concrete walkways, custom interpretive pylons, pavilion, exterior restoration and interior improvements of the historic Mamer Clock Tower, site lighting, irrigation, landscaping, turf, and other work indicated in the Contract Documents.
Bidding Closed
1/31/20 10:00 am
OLD - Airport Drive Inbound Realignment - 18-41-1937
Spokane International Airport
Spokane, WA
The general nature of the Work is as follows: Construct 3,000 feet of 2-lane principal arterial roadway on Airport property. The Work includes clearing and grubbing, excavation and backfill, grading, storm drainage improvements, utilities by the Contractor and purveyors, base course, paving, striping, signing, fencing, site lighting, landscaping, and various other site improvements.
Bidding Closed
1/10/20 2:00 pm
Rental Car Facility Improvements Phase 1A, 19-44-1943
Spokane International Airport
Spokane, WA
The Work includes providing and installing a new heated concrete slab and trench drain on the south side of the Quick Turnaround Area (QTA) Building, improvements to the QTA Building mechanical room, new carwash entry and exit doors at the QTA Building and Public Car Wash, and new security cameras and electrical support at the QTA Building. The construction will be phased so that the QTA Building can remain in operation, with cars using the fueling bays and car washes during construction.