Public Jobs

Bids due in 8 days
10/3/17
SIA - Administrative Annex Project
Spokane International Airport
Spokane, Eastern WA
Toilet Rooms: Second Floor Mezzanine Level - tile refinish, ceiling refinish, partitions revamping, miscellaneous specialties equipment replacement, light replacement, and sinks replacement at second floor. Floor and base replacement at first floor. Administration Annex interior partition and ceiling demolition, and interior improvements. IRC Event Center structural modifications and finishes repair. Scope of work includes the following: Division 0 - Procurement and Contracting Requirement, Division 1 - General Requirements, Division 2 - Existing Conditions, Division 4 - Masonry, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 8 - Openings, Division 9 - Finishes, Division 10 - Specialties, Division 11 - Equipment, Division 12 - Furnishings, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical
Bids due in 9 days
10/4/17
SIA - Airfield Maintenance Headquarters & Fuel Control Facility Partial Interior Remodel
Spokane International Airport
Spokane, Eastern WA
Airfield Maintenance Headquarters: Remodeling and reconfiguration of existing Training Room and Lockers. Mechanical, electrical, fire protection, and complete interior finishes are included in the Contract. Fuel Control Facility: Remodeling and reconfiguration of existing washrooms and locker areas. Mechanical, electrical, fire protection, and complete interior finishes are included in the Contract. Scope of work includes the following: Division 0 - Procurement and Contracting Requirement, Division 1 - General Requirements, Division 2 - Existing Conditions, Division 6 - Wood Plastics and Composites, Division 8 - Openings, Division 9 - Finishes, Division 10 - Specialties, Division 11 - Equipment, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical, Division 28 - Electronic Safety and Security
Bidding Closed
9/25/17
SIA - Signage Upgrade Project
Spokane International Airport
Spokane, Eastern WA
The Work includes demolition and disposal of existing signs, sign lighting, sign structures and supports, and foundations as shown on the plans. The Work also includes installing: new signs on existing sign structures including all retrofit necessary to install new signs and structural evaluation of existing sign structures for installation of new signs, and new signs on new sign structures including foundations, structural design of new sign structures and foundations. Scope of work includes the following: Division 1 - General Requirements, Division 10 - Specialties, Division 27 - Communications
Bids due in 2 years
12/31/19
2017/2018/2019 A/E Consultant Roster RFQ - Ongoing
Spokane International Airport
Spokane, WA
Statements of Qualifications are being received by the Spokane Airports for the 2017/2018/2019 roster on an on-going basis. These submittals will form the basis for establishment of a roster of firms for a three year period, who qualify to negotiate consulting services with Spokane Airports for selected projects with fees less than $50,000.