Public Jobs

Bidding Closed
3/30/17
SIA - Fancher Property Fence & Building Demolition
Spokane International Airport
Spokane Valley, Eastern WA
The Work includes, but is not limited to, demolition and removal of existing buildings and miscellaneous items; removal and disposal of asphalt, removal and disposal of Asbestos-containing materials; backfill, clearing and grubbing, compaction and grading of project site; demolition of trees; fence and gate installation; and placement and compaction of capping material and crushed aggregate. Scope of work includes the following: Division 1 - General Requirements, Division 2 - Existing Conditions, Division 31 - Earthwork, Division 32 - Exterior Improvements.
Bids due in 2 years
12/31/19
2017/2018/2019 A/E Consultant Roster RFQ - Ongoing
Spokane International Airport
Spokane, WA
Statements of Qualifications are being received by the Spokane Airports for the 2017/2018/2019 roster on an on-going basis. These submittals will form the basis for establishment of a roster of firms for a three year period, who qualify to negotiate consulting services with Spokane Airports for selected projects with fees less than $50,000.
Bidding Closed
9/7/16
South Pilot Ramp Rehabilitation Re-bid, #15-41-1833
Spokane International Airport
Spokane, Eastern WA
The Work is generally described as the rehabilitation of the South Pilot Ramp and north half of Taxiway C-2 at the Spokane International Airport. Work will include pavement and building slab demolition, excavation/embankment, subsurface drainage system, base course, asphalt paving, concrete paving, removal and replacement of pavement markings, temporary and permanent security fencing, guidance signs, edge lighting, stormwater structures, landscaping, topsoil and seeding.
Bidding Closed
8/16/16
Airfield Pavement Weather Sensors, #16-41-1869
Spokane International Airport
Spokane, Eastern WA
The general nature of the Work is as follows: Providing and installing 12 pavement sensors, one underground (sub-surface) sensor, and two dedicated weather stations with remote processing units (RPU’s). The embedded sensors will communicate with the weather stations to relay information via cellular service back to a third party cloud-based web server to be accessed by SIA staff. Scope of work includes the following: Division 1 - General Requirements, Division 2 - Site Construction, Division 16 - Electrical.
Bidding Closed
8/23/16
EDS Upgrades & CBRA Improvements, #12-34
Spokane International Airport
Spokane, Eastern WA
The Work includes furnishing, installing, and modifying new and existing conveyors and controls in Terminal A1, A2 and A3 CBRA areas as well as addition of a redundant crossover conveyor interconnecting the A1 screening matrix to the A3 screening matrix. Concourse C work includes demolition of the existing CBRA and reconstruction of a new CBRA conveyors and controls. Temporary ticket counter tie-ins to the existing claim device are required along with coordination with TSA for implementing a lobby screening solution during construction. Associated with the Work are wall openings and new walls, electrical lighting, sound baffles, camera relocations, new TSA screening tables with PTRI monitors. Scope of work includes the following: Division 1 - General Requirements, Division 2 - Existing Conditions, Division 3 - Concrete, Division 5 - Metals, Division 6 - Wood Plastics and Composites, Division 7 - Thermal and Moisture Protection, Division 8 - Openings, Division 9 - Finishes, Division 22 - Plumbing, Division 23 - Heating Ventilating and Air Conditioning (HVAC), Division 26 - Electrical, Division 27 - Communications, Division 28 - Electronic Safety and Security, Division 32 - Exterior Improvements, Division 34 - Transportation.